Wednesday, 9 December 2009

The final boiler pump scene

After working alongside fellow members of the group a final animated scene of the boiler pump and surrounding environment were created. The boiler pump was created in three seperate parts and assembled together within the environment. It was unfortunately decided that the hot water tank and other models i have created were taking up too much time whilst rendering and too much space within the environment so were deleted. also the bump map used on the concrete floor was removed to further reduce rendering time. looking at the final video this was a shame as the floor texture looked rather too flat.

However the assembled models within the environment worked together and a camera path was set up to follow arounf the room showing various objects, and most importantly the functioning boiler pump.

We used a voice recorder to save a sound description from myself, stating what the object in the video was, its purpose and function.

Finally the sound and video images were assembled together in another software package, with a fire background sound to simulate the boiler.

No comments:

Post a Comment